Yuba College

Project Info

Owner

Yuba Community College District | Yuba City, CA | George Parker (530) 634-7643

Architect

TLCD Architecture | 111 Santa Rosa Ave., Suite 300 | Santa Rosa, CA 95404 | Kevin Teel (707) 525-5600

General Contractor

Sundt Construction | 2860 Gateway Oaks Drive, Suite 300 | Sacramento, CA 95833 | Kristy Weiland (916) 830-8000

Electrical Engineer

The Engineer Enterprise | 853 Lincoln Way, Suite 105 | Auburn, CA 95603 | Danny McKevitt (530) 886-8556

Location

Building Size

26,000 SQ FT

Project Type

Design/Bid/Build

Date Contract Secured

LEED Qualification

LEED Silver

Project Description

Schetter Electric, Inc. furnished and installed the electrical for the Yuba Community College Clearlake campus project. Schetter Electric, Inc. also used BIM for the coordination for the Clearlake campus project. The project at the Clearlake campus consisted of (2) two new ground up 1-story buildings and (1) one new ground-up 2-story building, with all (3) three buildings totaling 26,000 SQ Ft. The new facilities provide consolidated student services, space for administration and operations, science labs, culinary arts, a library and learning resources. The current campus, which was originally built in 1975, is composed primarily of modular building and has little visibility to the community. The Districts goal for this new project was to create a new college center and identity.