CHP Truckee Relocation Project

CHP Truckee Relocation Project

Project Info

Client CHP
Tags ,

Project Description

The CHP Truckee Project is a relocation facility for the local CHP field base of operations made up of 5 buildings A, B, C, D & E totaling 40,299 SF. The Campus contains a 125′ tall communications tower with a 367 SF radio vault room. The main building A contains a public lobby area with a bullet proof reception area, conference room, briefing room, men’s & woman’s locker rooms as well as an armory and secure evidence storage rooms. There is also a complete auto maintenance facility with tire balancer, tire changer, parts washer, (2) vertical vehicle lifts and a vehicle exhaust extraction system along with nearly 3,000 SF of clerical office area. Additionally, there is also a vehicle car wash, a fuel service station (with a 5KVA UPS backup) and (2) electric vehicle charging stations. The main Electrical system consists of a 1000A main switch board, 2 Distribution switchboards and 12 branch panelboards complete with a 350 KW Standby Generator with a 150KVA Load Bank & (2) ATS’S. The facility also has two joined patrol car parking buildings D&E. Building Lighting is Lithonia with Night controls.